Minimum Roof Edge Details
In a staggered pattern.
Minimum roof edge details. Under the roofing a continuous integral apron is installed and nailed at 3 o c. The eave ends of the standing seam are formed and folded vertically. Two types of eaves one with a gutter and one with a copper edge strip are shown. Slope should be built into the structure on new buildings.
Detail drawing pdf pdf 137 kb. Sika sarnafil minimum requirements detail drawing pdf pdf 190 kb. Struction details illustrated in this manual depict wood nailers and blocking at roof edges and other points of roof termination. Drip edge metal valley flashing dormer chimney and kickout flashing are types of roof flashing that shed water away from the connections between roofs walls chimneys and other building assemblies.
Roof drip edge flashing serves multiple functions on a building the foremost of which is to assist water in leaving the roof edge with minimum damage to other building components by directing the water off of the roof and into the gutter. Alpine snowguard colorgard detail with décor profile. Click to enlarge any image. Sheet and fastener layout plan at perimeter edge.
Download cad file download cad file. Roof slope of 1 4 per foot minimum is required on all roof systems. Secondary roof drains are to be positioned on the roof so that water will drains to the primary upslope and they should not be installed at the same elevation as the primary.