Minimum Height Of Roof Drain Terminal
Flange will have a minimum 4 width with a 3 16 lip at drain body.
Minimum height of roof drain terminal. The modern roof drain is designed to drain off rainwater in the most effec. We describe online roof drainage requirements calculators pertinent plumbing standards a table approach to looking up roof drainage. C the vent pipe is increased to not less than 3 in. In sizebefore penetrating a wall or roof and d where the buildingis 4 storeys or less in height the vent pipe terminates above the roof of the building.
Roughing dimensions of the body must be adjusted. By the 1997 edition of the upc section 1101 11 2 had been added that completely prescribed where and how secondary roof drainage was to be provided. Design and installation of roof drainage systems shall comply with section 1503 of this code and sections 1106 and 1108 as applicable of the international plumbing code. P 1503 4 1 secondary emergency overflow drains or scuppers.
If water proof deck covering thickness is greater or less than 3 16 lip dimension must be specified. The waterproof membrane extends 150mm height in the door reveal and roof abutment wall. A good rule to follow is to provide two roof drains for a total roof area less than 10 000 square feet. The waterproof membrane flashing extends fully below the door frame bottom rail and is sealed to.
This article describes several methods for determining the drainage capacity required to safely drain water off of building roofs whether from rainfall melting snow or a combination of those water sources. Watts drainage products rd 300 r series 4 in. Once the drainage system is determined the designer must ensure positive drainage by correctly positioning the roof drains. Roof drainage requirements specifications.
Overflow drains shall be the same size as the roof drains with the inlet flow line two inches above the low point of the roof and shall be installed independent from the roof drains. A horizontal gap of minimum 10mm between frame front edge and drainage. Any increase in the size of the vent shall be made inside the structure a minimum of 1 foot 305 mm below the roof or inside the wall. P 1503 4 roof drainage.
Cast iron roof drain with 2 in.