Mayline Parallel Bar Installation Instructions
Secure corner plates using four 6 x 1 2 screws d.
Mayline parallel bar installation instructions. 66 and 72 rectangular desk assembly instructions ard7230 ard6630 ard6030. Transparent blade for see through registration and fine line drawing quality. 1 16 of 101 results for mayline parallel bar price and other details may vary based on size and color. Ball bearing rollers built into durable black phenolic plastic base.
Parallel with worksurface edge. Parallel straightedge replacement parts can be found here. Up and down arrows will open main level menus and toggle through sub tier links. The wire used to move the parallel bar up and down is mounted on a series of pulleys which are in turn mounted to the drafting board with screws.
2 9 out of 5 stars 4. This parallel bar moves seemlessly across the drawing surface has resulted in little to no smudging and in conjuction with a proper set. Align cable parallel with edge of board stedge stop cable 1b cable 1a 9. Free shipping by amazon.
Align cable parallel with edge of board as shown in fig. Left and right arrows move across top level links and expand close menus in sub levels. Get it as soon as wed sep 9. Try to move the pulley from left to right.
Be sure that the cable passes between cable clamp and l h. Overview straightedge mobile parallel ruling w e z grip. These products are also called mayline parallel straightedges parallel drafting bars parallel bars and parallel straightedges. Alvin paral liner 1101 48 mobile parallel straightedge 48 inches.
Examine the pulley mounts. Over time the screws become loose causing the wire to become slack. Instructions to convert above board parallel rule to under board attachment when ordering components specific color and or size information may be required. Drill 3 32 pilot holes at marked locations.
Remember to read all the instructions before beginning the installation or you may miss the opportunity to install the metal clips which stop your bar for moving side side or worse you could damage the bar. The drafting bar literally floats across the drawing surface and come with all mounting hardware. Place each pulley between your thumb and index finger. Even in today s world of electronics many design professionals are still using parallel straightedges to draw a line that is square drafting triangles or helping with quick sketches before reproducing your ideas electronically.
The site navigation utilizes arrow enter escape and space bar key commands. Attach cable ends with terminals to spring. Contact a mayline customer service representative. Install cable clamp e onto stud of left corner plate c.
E z grip cap the e z grip cap is a handy 5 16 raised gripping bar that allows for easy maneuverability. Be sure cable passes between clamp and corner plate. Only 1 left in stock order soon.